Our Engineering, Procurement and Construction (EPC) contractor, United Infrastructure (UI) is progressing with a series of works along the Main Onshore Pipeline (the Pipeline) route. These works are in place to ensure the Pipeline is delivered safely and in line with its construction schedule.
We are pleased to announce that UI has completed the majority of fencing along the Pipeline route. This fencing provides a clear marking of the Pipeline route and access areas required for its construction.
With fencing now complete, you may start to notice increased activity from the UI team along it. This includes:
Future updates about these works will be uploaded onto the HyNet Hub in advance.
If you have any questions about these works or would like more information, please contact the team by emailing hello@hynethub.co.uk or calling 0113 395 4495 (Monday to Friday between 9am to 5pm, except bank holidays).
Fencing along the Pipeline route
We are pleased to announce that UI has completed the majority of fencing along the Pipeline route. This fencing provides a clear marking of the Pipeline route and access areas required for its construction.
Further works along the Pipeline route
With fencing now complete, you may start to notice increased activity from the UI team along it. This includes:
- Preparing access routes
- Installing temporary drainage systems
- Topsoil stripping
- Pipeline stringing
- Trenching
- Backfilling and reinstatement
Future updates about these works will be uploaded onto the HyNet Hub in advance.
If you have any questions about these works or would like more information, please contact the team by emailing hello@hynethub.co.uk or calling 0113 395 4495 (Monday to Friday between 9am to 5pm, except bank holidays).